2019 Street Reconstruction RFQ

REQUEST FOR DESIGN/BUILD TEAM QUALIFICATIONS FOR ROAD AND STORMWATER IMPROVEMENTS ON 2019 STREET RECONSTRUCTION

The City of Edgerton is seeking qualifications from Design/Build Teams for design of a street reconstruction project, consisting of Street A, Street B, and Street C (described below). The project will include stormwater, sidewalk, and street improvements.

Street A consists of the following segments:

W. 7th Street from W. Cumberland Drive to W. Edgewood Drive (appx. 370 LF)

W. Cumberland Drive from W. 5th Street to W. 6th Street (appx. 382 LF)

W. Cumberland Drive from W. 6th Street to W. 7th Street (appx. 281 LF)

W. 4th Street from W. Meriwood Lane to W. Edgewood Drive (appx. 475 LF)

W. 5th Street from the Cul-de-sac to W. Edgewood Drive (appx. 137 LF)

Street B consists of the following segments:

W. 3rd Circle from W. 3rd Street to Cul-de-sac (appx. 105 LF)

W. Shanandoah Drive from W. 4th Street to W. 7th Street (appx. 918 LF)

Street C consists of the following segments:

Heather Knoll Drive from W. 3rd Street to W. 4th Street (appx. 265 LF)

Heather Knoll Drive from W. 4th Street to Heather Knoll Circle (appx. 233 LF)

Heather Knoll Drive from Heather Knoll Circle to W. 7th Street (appx. 672 LF)

Heather Knoll Drive from W. 7th Street to W. 8th Street (appx. 314 LF)

Heather Knoll Circle from Heather Knoll Drive to Cul-de-sac (appx. 148 LF)

Street A, B, and C all are segments of roadway that are passed their useful life. The project area is in the Southwestern section of Edgerton, located between 1st Street and 8th Street. The Street sections are typically 28 FT wide, with 50 FT of right-of-way, and have a total length of approximately 4,300 LF.

IN BRIEF SUBMISSION REQUIREMENTS

 A mandatory pre-submittal meeting will be held in at Edgerton City Hall, 404 East Nelson Street on April 10, 2019 at 1:00 PM. Edgerton staff and partners will provide a brief presentation of the project and answer questions.

 Submit four (4) paper copies and one (1) electronic copy (on USB drive) of the response to the City of Edgerton prior to 4:00 pm on April 24, 2019

See 2019 Street Reconstruction RFQ - PDF for additional information about the project, the detailed submission requirements and our RFQ guidelines.